Locations
Modular in design, construction of the first unit complete at Warren in New South Wales, Australia. Production from this module is 420kg per hour – equivalent to 44 passenger car tyres.
A completed plant consists of six modules each operating independently with maximum flexibility for performing scheduled maintenance. A six module design in full operation will dispose of over 19,367 tonnes of tyres every year.
Rollout of Australian Plants
GDT has plans for 7 plants in Australia (including the existing plant at Warren in NSW) plus a possible 2 further
locations
Key Factors in Selecting Sites
- Proximity to ELT Sources tyre retailers, ELT stock piles, or landfill
- Availability of efficient transport
- Proximity to interstate rail freight lines & road transport
- Existence of Active Local Government Recycling Programs
Warren Plant New South Wales
Proposed Toowoomba Site
A replica of the full plant containing 6 modules is ready for construction in Toowoomba with EPA and DA approvals in place.